Arena Simulation Case Study
Recent Posts
Improvement of Food Sortation System Performance Using Arena® Packaging Optimization
Posted by
Arena Simulation Case Study on Apr 4, 2017 9:51:00 PM
0 Comments Click here to read/write comments
The Challenge
Designing the most cost effective integrated solution that provides a robust system capable of delivering budget tonnages.
0 Comments Click here to read/write comments
Topics: Logistics, Mining, Port & Terminal, Supply Chain
Manufacturing Simulation Reduces Inventories and Order Lead Times
Posted by
Arena Simulation Case Study on Jul 31, 2016 10:30:00 PM
The Challenge
Determine at the planning and evaluation stages that lean manufacturing is the optimal manufacturing method.
0 Comments Click here to read/write comments
DFW Maintains Security Efficiency During Expansion Project with Arena
Posted by
Arena Simulation Case Study on Jul 5, 2016 10:36:00 PM
The Challenge
The TRIP plans update 60% to 70% of each of the four Terminals – an incredible undertaking.
0 Comments Click here to read/write comments
Document Imaging Customer Service Simulation
Posted by
Arena Simulation Case Study on May 30, 2016 10:42:00 PM
The Challenge
A solution capable of representing each team’s operating policies and inter-team backup strategies was needed for efficiency.
0 Comments Click here to read/write comments
Arena Achieves 10% Increase in Production Capacity and 80% Less Downtime on $18M Packaging Line
Posted by
Arena Simulation Case Study on Mar 30, 2016 10:50:00 PM
The Challenge
To determine how many pieces of equipment were functioning normally and which ones needed to be upgraded or replaced.
0 Comments Click here to read/write comments
Leading U.S. Pork Producer Uses Arena Supply Chain Modeling To Establish Regional Strategy
Posted by
Arena Simulation Case Study on Feb 29, 2016 10:56:00 PM
The Challenge
To determine the optimal number of business regions and which assets should be included in each.
0 Comments Click here to read/write comments
Your Blog Post Title Here...Medical Packaging Manufacturer Optimizes Machine Performance
Posted by
Arena Simulation Case Study on Dec 5, 2015 11:00:00 PM
The Challenge
MTS needed to test a many variables upfront in order to minimize risk, optimize engineering time and gain customer buy-in.
0 Comments Click here to read/write comments