Arena Simulation Newsletter and Blog

Optimizing Pit to Port Logistics

Written by Arena Simulation Case Study | Aug 17, 2016 2:23:00 AM

The Challenge

Designing the most cost effective integrated solution that provides a robust system capable of delivering budget tonnages.

The Arena Solution

Recognizing SMS as a leader in modelling and analytics technologies, the SMS team was engaged to review supply chain logistics to ensure target throughput levels could be achieved and proposed infrastructure was appropriately sized. 

Simulation modelling provides a means of understanding the likely performance of supply chains with complex interacting subsystems. Having developed numerous models of mining supply chains, SMS knew that the Arena simulation software was eminently suited to simulate and evaluate the supply chain operations. 

SMS worked with project stakeholders to review the proposed supply chain design and establish a ‘base case’ scenario representing the most likely value of parameters and assumptions to be provided as input in the modelling system.
 

Broadly, the Arena model simulated:

  • Production from both underground and opencut sources
  • Stockpiling of coal, as necessary, in ROM and product stockpile
  • Coal Preparation Plant (CPP) operations
  • Train Load Out (TLO) operations
  • Arrival of third party trains into the proposed balloon loop
  • Transit of trains to the export terminal
  • Arrival and loading of export vessels for delivery to the customer

Importantly, the Arena model incorporated the variability inherent in the proposed supply chain. Variability was applied to:

  • Mine production rates
  • Arrival of trains into the balloon loop
  • Arrival of export vessels to the port
  • Frequency and duration of unplanned delay events
  • Frequency and duration of weather delays

By creating an Arena model driven by externally defined data, SMS were able to simulate a large range of scenarios to provide an understanding of the impact that changes in parameters and assumptions had on overall supply chain throughput.

Results

Having developed the modelling system and simulated a wide range of scenarios, SMS was able to provide feedback on a number of issues within the proposed supply chain.

For a given scenario, SMS provided the following guidance:

  • Production and export rates achievable
  • Stockpiling requirements in ROM, Raw and Product stockpiles
    • Not just in terms of the average stock level, but presenting histograms describing the amount of time stocks would be in defined bands.
    • This included quantifying the amount of double handling on the product stockpile as a result of having to push product into the stockpile ‘dead area’ requiring dozer intervention.
  • Impact of cargo assembly vs. stockpiling export terminal options on stockpiling and rail requirements
  • Understanding stockpiling requirements as the mine transitions from opencut to underground production

The modelling review provided project stakeholders with confidence that the design being taken forward for construction would deliver the desired outcomes, without being over capitalized.

Learn more about SMS at www.simulationmodelling.com.au

Established in 1986, SMS is recognized as a leader in the application of modelling and analytics technologies to help companies evaluate capital, improvement or cost saving projects. Through our technology and services we minimize the risk associated with decision making in your business.

Call SMS on +61 2 4926 1500 or email: smsmail@simulationmodelling.com.au.

Download case study

Read the Full Case Study (PDF)