HeaderImage1.jpg

Arena Newsletter and Blog

Arena Simulation Case Study

Recent Posts

Arena E-Learnings

Posted by Arena Simulation Case Study on Jan 13, 2021 2:52:54 PM

Last year during our User Group Conference, we unveiled that we're implementing a new online learning platform. We've been hard at work in completing the designs and want to make sure our customers are up to date with our progress. 

Read More

Arena Simulation Healthcare User's Group

Posted by Arena Simulation Case Study on Dec 21, 2020 10:51:49 AM

Dear Users,

Read More

Crystal Reports in 16.1

Posted by Arena Simulation Case Study on Dec 7, 2020 4:01:43 PM

Arena Installation

SAP Crystal Reports runtime engine for .NET Framework is required to display Crystal Reports at the end of the model run.  In past versions of Arena, Crystal reports was automatically installed during the Arena installation process. That is no longer the case.  It is now a separate step in installing Arena 16.1.  Install Arena by selecting the MediaImage folder > autorun.exe. 

Read More

Arena 16.1

Posted by Arena Simulation Case Study on Nov 9, 2020 5:37:05 PM

We are proud to release Arena version 16.1. This is available immediately for download by clicking here. For those that were unable to view our user group sessions, we've included a video below that reviews the key features. You can also view the full feature list by clicking here.

Read More

Arena Virtual Conference Recordings

Posted by Arena Simulation Case Study on Oct 14, 2020 3:02:11 PM

On September 30th, we held our Academic Symposium for Educators teaching Arena around the globe. Sessions included introducing the new interface of Arena Version 16.1, Feedback from our End Users to Students, and Guest Professors showing analytical work they’ve done in Arena. We want to thank our guest presenters and welcome those who were unable to attend to see the recorded sessions here.

Read More

Major Electronics Manufacturer Saves Over $50 Million with Supply Chain Optimization

Posted by Arena Simulation Case Study on Jul 27, 2017 9:39:00 PM

The Challenge

Redesign the company’s supply chain so they could share resources and channels in a forward and reverse logistics supply chain.

Read More

Cancer Treatment Facility Reduces Patient Time in Clinic by 25% with Arena

Posted by Arena Simulation Case Study on Jun 1, 2017 9:46:00 PM

The Challenge

Demand increased 133%, and the clinic had to reduce wait time and improve flow in a complex and highly variable process.

Read More

Improvement of Food Sortation System Performance Using Arena® Packaging Optimization

Posted by Arena Simulation Case Study on Apr 4, 2017 9:51:00 PM

The Challenge

Funnel pies from a wide conveyor belt into a single file line, without colliding.

Read More

Optimizing Pit to Port Logistics

Posted by Arena Simulation Case Study on Aug 16, 2016 10:23:00 PM

The Challenge

Designing the most cost effective integrated solution that provides a robust system capable of delivering budget tonnages.

Read More

Topics: Logistics, Mining, Port & Terminal, Supply Chain

Manufacturing Simulation Reduces Inventories and Order Lead Times

Posted by Arena Simulation Case Study on Jul 31, 2016 10:30:00 PM

The Challenge

Determine at the planning and evaluation stages that lean manufacturing is the optimal manufacturing method.

Read More

Subscribe to Blog Updates

The Arena Blog helps our employees and guest bloggers share technology and industry-related trends with you.

We share:

  • Best Practices
  • Helpful Hints
  • Case Studies
  • And more!

Recent Posts

HeaderImage1.jpg